Design and technology in the news · page 2

Aerospace, Defence & Marine

Lunar Excavator Prototype Readied for Moon Base

A lunar excavator built by Interlune and Vermeer processes 100 metric tons of Moon rock per hour, targeting NASA's Moon Base programme by 2028.

Deep dive: Adapting Earthmoving Machinery for One-Sixth Gravity

4 min read

Construction & InfrastructureInnovation

3D Printed Barracks Built in 58 Days at Fort Bliss

The US Army's 3D printed barracks at Fort Bliss mark the largest robotic construction deployment in military history, built four times faster than normal.

Deep dive: The Physics and Logistics Behind 3D Printed Barracks

5 min read

Construction & Infrastructure

HS2 M42 Twin Box Structure: Building a Bridge Over Live Traffic

How are engineers installing the HS2 M42 twin box structure over a live motorway? Discover the modular construction and A-level physics behind this massive…

Deep dive: inside the HS2 M42 twin box structure

5 min read

Construction & InfrastructureInnovation

Lower Thames Crossing Tunnel Boring Machine Selected

The Lower Thames Crossing tunnel boring machine will be Europe's largest at 16.4m diameter, built by Herrenknecht to dig the UK's longest road tunnel.

Deep dive: How the Lower Thames Crossing tunnel boring machine works

5 min read

Aerospace, Defence & MarineInnovation

JetZero Begins Building Its Blended Wing Body Aircraft

JetZero has started assembling its full-scale blended wing body aircraft demonstrator Jet1 in Mojave, promising 50% lower fuel burn for airlines.

Deep dive: why blended wing body aircraft burn less fuel

4 min read

Electronics & CommunicationsBreakthroughs

Printed Artificial Neurons Communicate With Brain Cells

Northwestern University engineers have created printed artificial neurons that generate realistic electrical signals capable of activating living brain cells.

Deep dive: How Printed Artificial Neurons Work

4 min read

Aerospace, Defence & MarineBreakthroughs

Starship V3 Test Flight Proves Engine Redundancy Works

SpaceX's Starship V3 test flight launched from Starbase Texas, standing 124m tall with 33 Raptor 3 engines and carrying 20 mock Starlink satellites.

Deep dive: How 33 Engines Talk to One Computer

5 min read

Construction & InfrastructureInnovation

Olympic Park Footbridge: £19M Steel Span Opens in London

A £19M Olympic Park footbridge has opened at Queen Elizabeth Olympic Park in London, a 44-metre single-span steel structure floated into position by pontoon.

Deep dive: Single-Span Steel Bridge Design

4 min read