23 November 2026 · 10 minutes

Engineering in the News: 23 November 2026

How to run it in 10 minutes

  • 0:00 to 0:30 Title slide: introduce this week’s three stories.
  • 0:30 to 3:30 Slides 2 to 4: one minute per story. Read the three lines, point to the science and the jobs.
  • 3:30 to 8:30 Slide 5: five-minute debate. One minute to pick a statement and sides, three minutes to argue, one minute to vote.
  • 8:30 to 10:00 Slide 6: two-minute challenge, then reveal the answer.

What happened

Two steel footbridges will leap a busy road

Winvic will design and build two curving steel footbridges, 50 m and 55 m long, over the A1301 at the Wellcome Genome Campus near Cambridge. They are designed to protect mature trees, will be lifted into place in early 2027 and open in 2028. Read the story.

Science link: bending moment M = wL² ÷ 8 (A-level Maths, mechanics). Jobs: structural engineer, site engineer.

Plugging ships into wind turbines

Stillstrom by Maersk, which has a UK company in Aberdeen, has built and factory-tested an 11 kV Vessel Connection Unit that lets service ships charge their batteries from offshore wind turbines. Sea trials of the full system are planned by summer 2027. Read the story.

Science link: P = IV and I²R losses (GCSE and A-level Physics, electricity). Jobs: electrical engineer, offshore wind technician.

UK-built detectors for a giant neutrino hunt

Construction has begun nearly a mile underground in South Dakota on DUNE, the Deep Underground Neutrino Experiment. The UK is building 137 of its 150 wire detector panels, each carrying about 24 km of wire, and the neutrino beam is due by 2031. Read the story.

Science link: speed = distance ÷ time; 1,300 km at almost the speed of light takes about 4.3 ms (GCSE Physics). Jobs: electronic engineer, software engineer.

Five-minute debate

  1. Beautiful bridges are worth paying extra for. For: good design makes people use a crossing and improves a place; these curves protect mature trees. Against: money spent on looks could pay for another crossing or for maintenance.
  2. Every ship that services an offshore wind farm should run on wind power. For: the ships sit beside turbines making electricity, so burning fuel there is wasteful. Against: the technology has only been factory-tested so far, and batteries add weight and cost.
  3. Countries should fund experiments that may never have a practical use. For: big physics labs have given us inventions such as the web, and the engineering skills spread into industry. Against: the money could go to problems we already know how to solve.

Two-minute challenge: answer

How much does the 55 m steel footbridge grow on a hot day? Steel expands by 12 × 10⁻⁶ of its length per °C. Taking a 40 °C swing: ΔL = αLΔT = 12 × 10⁻⁶ × 55 × 40 = 0.0264 m, so about 26 mm. That is why bridge decks sit on bearings and joints that let them slide. Extension: the 50 m bridge grows about 24 mm.

More stories: borntoengineer.com/stem-news

Gatsby Benchmarks 2, 4, 5